If you're planning a home renovation in Wichita Falls, Texas, one of the first questions you're likely asking is: How long is this going to take? And it’s a great question — because the timeline of your remodel affects everything from how you plan your daily routines to when you’ll see the final reveal.
At Axis Construction, we believe in setting clear expectations and working closely with homeowners to ensure your remodel is completed efficiently and with the highest level of craftsmanship. While every project is unique, we’re here to walk you through the average timelines you can expect for common remodels in Wichita Falls, and what factors can impact those timelines—for better or worse.
To give you a quick overview, here’s what you can typically expect when it comes to remodeling timelines:
Kitchen Remodel: 8 to 16–20 weeks
Primary Bathroom Remodel: 6 to 12 weeks
Home Addition: 12 to 24 weeks
Whole Home Remodel: 16 to 24 weeks
Accessory Dwelling Unit (ADU): 20 to 40 weeks
Custom Home Build: 9 months or more
These ranges reflect the average time for the construction phase—but that’s only part of the picture. The design phase also plays a big role in your overall timeline, and that’s where our team helps you build a strong foundation before the first hammer ever swings.
Every successful project begins with a thoughtful and detailed planning phase. We break the process into two key stages: design and construction. Most people think only about the construction part, but at Axis Construction, we place just as much emphasis on the design phase—because that’s where delays can be prevented before they even begin.
As a rule of thumb:
The design phase usually takes about half the time of construction, though it can sometimes match it depending on the scope and complexity.
So for example, a 12-week kitchen remodel might need 6–12 weeks of design and planning before construction begins.
Skipping or rushing the design phase often leads to problems during construction—like material delays, permit issues, or costly change orders. But when you work with our team from the beginning, we help you nail down selections, drawings, permits, and schedules ahead of time, so the construction can flow smoothly.
The kitchen is the heart of the home—and remodeling it is one of the best ways to add value to your property and enjoyment to your daily life. Depending on the size and scope, a kitchen remodel in Wichita Falls usually takes between 8 and 20 weeks.
8–12 weeks for smaller updates like new cabinetry, countertops, and appliances.
16–20 weeks for major renovations that involve layout changes, moving walls or plumbing, or opening up to other areas of the home.
Common Factors that affect timing:
Custom vs. stock cabinetry
Structural changes
Delivery time of appliances and fixtures
Inspection and permitting schedules
With proper planning and a steady hand on project management, we help keep your kitchen timeline on track.
Bathroom remodels are generally smaller in size but can be surprisingly complex. The average Wichita Falls primary bathroom remodel takes 6 to 12 weeks, depending on whether it's a surface update or a full gut renovation.
Shorter remodels (6–8 weeks) include:
New tile
Updated vanities
Fixtures and lighting upgrades
Longer remodels (10–12+ weeks) may involve:
Layout reconfiguration
Custom showers or soaking tubs
Upgraded electrical or plumbing
Just like with kitchens, selecting materials in advance and locking down the design early can make a big difference.
Adding square footage is a major undertaking—and one of the most exciting upgrades for homeowners who love their current neighborhood but need more space. Whether you're adding a sunroom, expanding a master suite, or building a new second floor, the timeline is typically 12 to 24 weeks.
Factors influencing addition timelines:
Site preparation and foundation work
Roofing and structural tie-ins
Mechanical upgrades (HVAC, electrical, plumbing)
Weather delays (though we always plan around Texas seasons)
Because additions involve both exterior and interior work, they require coordination across multiple trades. That’s why we create a detailed project schedule from the very start.
Remodeling an entire home is a big commitment, but the results can be transformational. A whole home remodel in Wichita Falls typically takes 16 to 24 weeks, though larger or historic homes may take longer.
These remodels often include:
Multiple bathrooms and the kitchen
Flooring and finishes throughout
Structural work or reconfiguring the floor plan
Electrical and plumbing system upgrades
Whole home remodels also often require you to move out temporarily. We help clients prepare for this from the start, with a realistic timeline that supports a smooth transition back into your newly remodeled space.
Accessory Dwelling Units (ADUs)—like guest houses, garage apartments, or in-law suites—are becoming more popular across Wichita Falls as families look for added income or multi-generational living solutions.
These detached or attached units take 20 to 40 weeks to complete, depending on size, design complexity, and zoning regulations.
Typical phases include:
Feasibility & planning
Permitting
Foundation and framing
Full interior construction
Since many Wichita Falls ADUs are built from scratch, the process is similar to a custom home in some cases, requiring in-depth planning and precise execution.
A full custom home in Wichita Falls is the most involved type of project and typically takes 9 months or more from start to finish. At Axis Construction, we treat custom homes as a collaborative process, walking alongside you every step of the way—from land selection and architecture to finishes and final walkthrough.
What affects a custom home timeline?
Lot readiness (clearing, grading, access to utilities)
Design approval and permitting
Construction phasing and subcontractor availability
Custom selections and long lead-time items
The timeline can stretch depending on weather, inspections, and owner-driven changes. That’s why it’s essential to work with a team like ours that keeps the schedule on target and expectations realistic.
No matter the size of the remodel, a few common factors can derail the timeline:
Not having materials, permits, or designs finalized before construction begins is one of the biggest causes of delays. That’s why we put so much emphasis on a thorough pre-construction phase.
Making changes once the project is underway can result in backtracking, re-ordering materials, or reworking completed areas. It’s one of the biggest timeline killers—and budget busters.
If homeowners and contractors aren’t aligned, delays are inevitable. At Axis, we work as a team with you—openly, transparently, and consistently. Our job is to guide you through each step, flag potential issues early, and help you feel confident in every decision.
From day one, our goal is simple: to be on the same team as you, working together toward the successful and timely completion of your project.
Here's how we do that:
We start with an in-depth consultation and realistic project timeline tailored to your scope and goals.
We build out every detail in the design phase so there are no surprises later.
You’ll never have to wonder where your project stands—we keep you in the loop with updates, schedules, and next steps.
We help you understand how your timeline connects to your budget and where flexibility exists.
Life happens, and we get that. But our project managers keep everything moving forward, even when adjustments are needed.
A remodel is more than just construction—it’s a journey to create a better home and a better way of living. Whether you’re refreshing a kitchen, building an ADU, or dreaming of a custom home, understanding the timeline is essential to setting the right expectations and enjoying the process.
At Axis Construction, we believe the best results come from collaboration, preparation, and a shared commitment to your vision. We’re here to bring that vision to life—with craftsmanship you can count on and a timeline you can trust.
Let’s get started—together.